? Overall duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks.
2.11 Commissioning
Commissioning tests to be performed on site shall include but not limited to the next.
? Capacity evaluation with respect to guaranteed particulars
? Emission test with respect to limits set in annex 1. Note that bidder shall provide its own evaluation kit for
carrying out the emission tests.
? Flame safeguard. The performance of the flame safeguard system should be verified by causing fire and ignition
failures. Operation of the audible alarm (where applicable) and observable indicator should be verified. The shutdown
times should be verified.
? Testing of all shutdowns to the system.
? All interlocks provided should be tested for proper operation as specified by the device manufacturer.
? Combustion controls. The gas controls should be stable and function
– For some applications requiring rotary kiln incinerators but narrow;
– For hospital; incinerators requiring gas as LPG, diesel or heavy fuel oil: This market segment, my firm have been
had group clients to provide the equipment for more 5 years.
– Notably, the incinerator – model series (No auxiliary fuel is required): Those products are feasible to earnings
hundreds and thousand over the Vietnamese market in case of your products possessed the optimal technical specifications
and reasonable price. Those products are starting and suitable solution for combusting solid waste in Vietnamese
market which I have already promote research and testing.
market which I have already market research and testing.