The successful bidder will deliver the incinerator slide in a container. A containerized alternative is also acceptable.

incinerator with a closed air surroundings,  <98%

  • Electrically operated 220 volt ( 60 Cycle – 1 phaze )
  • Able to complete burning material that turns to ashes all the component elements of the carbon or metal in the

waste, but not to the degree that leads to the creation of a cluster similar to those resulting

  • Incinerator must maintain the high temperature in the combustion chamber to ensure complete combustion of the

 

 

2.9  Interfacing with existing Sludge System

 

– Incineration of industrial wastes, including pesticides and PCBs;

 

– Ability to incineration 300-500 kg / hour.

 

– Complete unit with gasoline washing machine.

 

The incinerator will be connected to the existing sludge handling system. The incinerator sludge tank will be filled

with sludge by way of a sludge circulating pump on the existing system. The sludge tank shall be equipped with

control valves which will open and close according to the level from the sludge tank.

 

 

For the DO tank, its filling line will be attached to the nearest DO supply piping. The DO tank shall be equipped with

a control valve for automatic filling of the tank and level switches which will activate automatic opening / closing.

 

 

2.10       Supervision of Installation, Testing & Commissioning

 

 

The successful bidder will also supply its rates to the oversight of testing and installation and commissioning of

the incinerator collection. The rates will not include accommodation charges. The following shall be covered under the

supervision of installation, testing and commissioning charges;