medcial incinerator manufacturer

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests

so as to enable sending of a CEB Engineer for witnessing  of  the  factory  tests.    A’Factory  Acceptance  Test

‘  schedule  shall  be

 

mutually agreed between the successful Bidder and the CEB Engineer.

NOTE: All fees inclusive of air tickets, food & hotel accommodation, local transport and other living expenses

for the CEB Engineer shall be borne by the successful Bidder.

The successful Bidder shall submit to the CEB Engineer the following documents prior to dispatch of the incinerator

set. Certificate of Conformity inclusive of this clause’We certify that, subject to exceptions or concessions

listed here after, the supplies detailed above were fabricated in compliance with the technical specifications of the

contract, order and that, all inspections and tests having been completed, the supplies comply in every aspect with the

relevant particular specifications, drawings, and relevant standards and regulations in force’.

?     Factory Acceptance Test(FAT) Certificates

?     Three(3) Complete Sets of As-Built Drawings

?     Installation and commissioning procedure for the incinerator set.

?     Program of works for carrying the installation and commissioning

?     Labour  and  logistic  requirement  for  carrying  out the installation  and commissioning.

?     All electrical drawings and wiring diagrams

Type of Waste: To deal with medical waste, categories A, B, C, D,E

Type of incinerator: Pyrolytic

Nominal Burn Speed: 50 to 60 Kg/hrat  3500Kcal/Kg

Loading: Manual, Batch Load

De ashing: Automatic or manual batch de ashing

The incinerator must prevent the discharge of black smoke and

fine dust, during the loadings

Main Chamber Capacity: 2 -3 m3

The insulation of the combustion chamber should be composed of

refractory bricks, using a high content of aluminium and insulates,

The plate of combustion in carborundum preventing the fixing of

glass and slags

Hours of operation/day: >10 hrs

Max operating Temperature: 14000C

Normal Operating Temperature (Main ): >8500C

Operating Temperature (Secondary): >11000C

It should have temperature regulators in electronic watch:

Carbon Content of Ash: <2%

The setup should be wholly free of visible smoke as well

as offensive odours.

Residence Time in Second Chamber: 2 seconds minimum

The Internal diameter of the Chimney: Ø 400

Height of Stack:  >8 m

Burner performance: Automatic On/Off

Fuel: Diesel

Fuel Consumption at rated capacity: >7 Kg waste/ltr

Electricity Consumption: <2kW at rated capacity

Operating Voltage: 220-240VAC 50 Hz

Spare Parts: Supply for 1 year quoted as alternative

Consumables: Supply for one year of performance to be mentioned

as alternative

Warranty: Parts and service support: 1 year minimum article

commissioning

Service Support: <72 hours.

Emission Standards Compliance: BS 3316 or équivalent standard

Process Filtering system: Scruber to be mentionned as alternative

CE Manufacturing Compliance: BS EN 746-2-1997

Design Specification: Types A, B, C, D, and E of medical waste

Installation and Commissioning: Contained in conditions of supply

Training in preventative and curative maintainance and use

of the incinerator: Operator training inclusive in provide

Capacity to treat Plastic: Not less than 40% by weight

Shed of the incinerator

Shelter of the incinerator inclusive in offer (the shelter must have

facilities for hand washing and firefighting).

This material and equipment must include in the drop of the

incinerator:

*   Foundation in rubble stone,

*   Isolation roofing against humidity;

* Elevation with brick of 20 cm (bloc cement), continuing lintel

(linteau) in reinforced concrete;

*  Steel frame (charpente en metal);

* Roofing in sheet B.C.A. 28 BG (Toiture en tôle),metal gutter,

*  Sanitary installation (wash basin, soak way pit of 20 m of depth);

*  Ash pit of 30 m3,

* Electrical installation;

* Concreteslab for fixing the incinerator;

* Chanel for evacuation of rain water or waste water

*  Wiremesh for aeration up the lintel;

* smoothrougtcasting of walls (interior and outside);

* plinth with cement;

*  2 metal doors;

*  Enemail paintings inside and latex paintings outside the shield

on walls and on doors;

*  Roofing limit (planche de rive);

*  Steps for this specification will depend on the size of this

incinerator which will determine the size of the drop of the incinerator.

on walls and on doors;

*  Roofing limit (planche de rive);

*  Measures for this specification will depend on the size of the

incinerator which will determine the size of the shed of the incinerator.