Basic Info.
Product Description
Technology Respond(FAQ)
Q: What’s kind of waste can utilize within this equipment? A: This gear for medical waste, pet animal, Municipal waste, live waste. Prohibit any volatile and radiation material, liquid waste and gas waste. GB18484-2001.
Q: Treatment capacity A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material.
Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are approximately 0.5-1 hours cooling time and time for feeding waste. Actual combustion time daily is about 16 hours. The life of incinerator between 5-10 year according to use.
Generally, we proposal small lab, little clinic use capability under 20 kgs per hour. When incinerator use in hospital, please compute the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is approximately 30-40 kgs per hour. According the operation time daily, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. *How to compute Animal Cremation Burn Rate: 2/3 of the medical waste.
Q: Assembly and Testing A: We provide all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn operation and installation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. The second combustion chamber: 1000-1200 centi level.
Q: Incinerator Control Mode A: Default Control mode is common control case. PLC mode according to order and model.
One person can service 02 device incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand risk of medical waste to protect worker self with necessary protection element.
Q: The Residency time in secondary combustion chamber A: 02 sec.
Annual around $500-$1000USD per year maintenance according model, use situation.
One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element.
Q: The Residency time in secondary combustion chamber
A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |