Infectious Waste Incinerator

Product Description

Principle of the Incinerator equipment is incineration/combustion/burn.

The main body is 1 combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is external oil or gas burner. The burner may be operating until waste burnout but for some waste such as plastic, newspaper (sometime, mix coal with waste before feeding), they could combustion itself following Ignition. During combustion, burner includes small medical incenerator, small medical office waste incinerators, small medical waste incineration, small medical waste incinerator manufacturers, small medical waste incinerators in china, a fan itself for Oxygen supply and also protect burner avoid heat damage from combustion chamber. And, there a external fan blow air into combustion chamber. The Exhaust gas blow out after combustion. 

Considering Environmental Protection requirements and rules, just about all incinerator have secondary combustion chamber (after-burn, post-combustion), even if third combustion chamber. The secondary burner burn the Exhaust gas from main combustion chamber, this technology make sure adequate combustion, few black smoke and smell. 

The upgraded incinerator technology focus on Exhaust gas treatment to remove Hazardous material and other purpose from incinerator, like heat recovery (waste to energy), save fuel cost, PLC Automation operation. 

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

In some Developed nations, some new waste treatment method such as High-temperature cooking, waste carbonization, devastating sterilization technology is instead of incineration technology.