Product Description
Principle of the Incinerator Gear is incineration/combustion/burn.
The main body is one combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is outside gas or oil burner. The burner may be operating until waste burnout but for some waste like plastic, newspaper (sometime, mix coal with waste before feeding), they can combustion itself after Ignition. During combustion, burner has a fan small incinerator cost, small incinerator lab, little incinerator maker, incinerator medical waste, little incinerator price in china, little incinerator primary chamber secondary, itself for Oxygen supply and protect burner prevent heat damage from combustion chamber. And, there a outside fan blow air into combustion chamber.
Considering Environmental Protection requirements and principles, almost all incinerator have secondary combustion chamber (after-burn, post-combustion), even if third combustion chamber. The secondary burner burn the Exhaust gas from main combustion chamber, this technology make sure adequate combustion, couple black smoke and odor.
The upgraded incinerator technology concentrate on Exhaust gas treatment to eliminate Hazardous material and other purpose from incinerator, like heat recovery (waste to energy), save fuel cost, PLC Automation performance.
Item | Customer Request | Example |
Application Scope | |
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
What kind of waste? | ____, _____% ____, _____% ____, _____% |
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
Quantity Request | 01.02.03^…unit |
|
Budget | $US Dollar. |
|
Operating Time | The staff work Hours per day. Our incinerator can work up to around 18 hours per day. |
|
Realization Date of project | In ___ year | |
Waste Output Capacity per Day? | |
1000kgs Per Day^ |
Request waste burn rate | Capacity: 100kgs Per hour^ | |
Request waste feed capacity | Capacity: 100kgs per feed^ | |
Whether Natural Gas Supply Local? | Yes or No. | |
Local Power | If 380V and 220V valid? | |
Product Installation Destination | |
Country or City name |
DestinationSeaport name? | To check sea freight charge. |
|
Customer | End-Customer, Agent, Government. |
|
Method of contract | Tender or Negotiation | |
Date of Tender limit | ||
How did you know our company? | ||
Other request or information | |
In some Developed nations, some new waste treatment method like High-temperature cooking, waste carbonization, devastating sterilization technology is instead of incineration technology.