Incinerators available from china

Incinerators used will be restricted to daylight hours of operation. This includes shutdown, cleaning and maintenance.

 

Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a

different waste stream is to be incinerated. The business will provide the contractor with a list of items that could be

incinerated. The bins must be

offered by the contractor to the exact same design as the storage containers for the raw waste streams and feature a lid design

that prevents contamination from water.

 

Ash from each waste stream will be sent for lab analysis after each initial incineration by the business and at

intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as

directed by the organization. The Contractor will be responsible for the safety of samples taken to reduce contamination

until set by the business or designated courier.

 

Ash will be disposed of at the direction of the Organization. It is the responsibility of the Contractor to make sure the ash

isn’t compromised until final disposal. Company will provide additional storage area for ash if and as required.

 

Delivery Program

 

The delivery schedule for the device with capacity 100 kg/h requested is no greater than 10 weeks and 14 weeks for the

unit with capacity 150 kg/h.  These timelines include unit mobilization.

APPENDIX A

WASTE INCINERATORS RECOMMENDATIONS

 

 

  1. Multiple chamber type, horizontal stationary cylindrical body;

 

  1. Capacity of 15 kilograms per hour;

ignition, gas regulator, registration  and security sensor  device for the absence of flame triggering solenoid valve

  1. Diesel-Powered;

mounted on the easel supply;

  1. Burners should  be  monoblock  type  with  built-in  fan,  motor,  electronic  programmer, automatic

 

burner;

 

  1. The system should have ventilation for sweeping previous gases before activating the fuel supply to the

burner;