what’s the incinerator of hospital pictures and drawings? if you want to build or buy new incinerator for hospital, confirm the waste capacity per day, like 100kgs per day or more and working time per day, like 10 hours and the capacity of incinerator is average 10kgs per hour and best to buy 10-20kgs per hour incinerator.
we supply small scale incinerator with cheap price cost for small hospital. if requst large capacity or more function, send the technical requirements to us.
Nanjing Clover Medical Technology Co.,Ltd.
buy a pharmaceutical incernation funnse in sa
what is incinarator
cremation cost
incinerator in mauritius
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on
the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame.
• The unit shall prevent leakage of the hot flue gas and any backfire.
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber
walls away from the fuel burner.
• A differential air pressure gauge connected to an electronic datalogger
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | |
Burn Rate (Average) | 10-20 kg/hour | 20-30 kg/hour | 30-50 kg/hour | 50-100 kg/hour | |
Control Mode | PLC Auto. | PLC Auto. | PLC Auto. | PLC Auto. | |
Combustion Chamber | 100L | 210L | 330L | 560L | |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | |
Secondary Chamber | 50L | 110L | 180L | 280L | |
Smoke Filter Chamber | Dry Scrubber | Dry Scrubber | Dry Scrubber | Dry Scrubber | |
Feed Mode | Manual | Manual | Manual | Manual | |
Voltage | 220V | 220V | 220V | 220V | |
Power | 0.75Kw | 0.83Kw | 0.99Kw | 1.2Kw | |
Diesel Oil Consumption (kg/hour) | Ave.8.4 | Ave.10.9 | Ave.13.3 | Ave.16.9 | |
Natural Gas Consumption (m3n/hour) | Ave.10.1 | Ave.13 | Ave.16 | Ave.20.2 | |
Temperature Monitor | Yes | Yes | Yes | Yes | |
Temperature Protection | Yes | Yes | Yes | Yes | |
Items/Model | TS100(PLC) | TS150(PLC) | TS300(PLC) | TS500(PLC) | |
Burn Rate (Average) | 100-150 kg/hour | 150-200 kg/hour | 300-400 kg/hour | 500-600 kg/hour | |
Control Mode | PLC Auto. | PLC Auto. | PLC Auto. | PLC Auto. | |
Combustion Chamber | 1200L | 1500L | 2000L | 3000L | |
Internal Dimensions | 120x100x100cm | 150x100x100cm | 170x120x100cm | 210x120x120cm | |
Secondary Chamber | 600L | 750L | 1000L | 1500L | |
Smoke Filter Chamber | Dry Scrubber | Dry Scrubber | Dry Scrubber | Dry Scrubber | |
Feed Mode | Manual | Manual | Manual | Manual | |
Voltage | 220V | 220V | 220V | 220V | |
Power | 1.38Kw | 1.69Kw | 2.57Kw | 4.88Kw | |
Diesel Oil Consumption (kg/hour) | Ave.20.4 | Ave.24.2 | Ave.33 | Ave.44 | |
Natural Gas Consumption (m3n/hour) | Ave.24.5 | Ave.29 | Ave.39.6 | Ave.52.8 | |
Temperature Monitor | Yes | Yes | Yes | Yes | |
Temperature Protection | Yes | Yes | Yes | Yes |
handover process shall include a detailed inspection and completion of a checklist and statement of operability.
” YES/NO
“Decommissioning, overhaul and repacking of the unit
Based upon a potential need for an incinerator unit to be moved to a new location the contractor will outline the key steps through a clear written procedure and direct demonstration by the contracted operator for the decommissioning and repacking of the units, so this can be achieved.
As part of this process it is envisioned that all bottom ash and fly ash will be removed, the unit will be cleaned, and the diesel fuel tank and generator will be completely emptied. The decommissioning work will include a detailed inspection and the replacement of any worn or damaged parts at the expense of the client. This may include repacking into a sea container for transport to the new location.
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)