of primary and secondary air?
7. Is it possible to have an automatic bottom ash unloading system?
9. Is it possible to have an automatic bottom ash unloading system?
6. Does it provide for management interventions to correct waste feed, grate speed, and temperature, quantity and supply
of primary and secondary air?
5. Does this include auxiliary burners?
3. Could it be supplied as a continuous system?
6. Does this contain system which automatically stops waste feeding when combustion parameters are not appropriate?
2. Could it be supplied as a continuous system?
8. Does this contain system which automatically stops waste feeding when combustion parameters are not appropriate?
3. Is there a data logging system?
Type of Design: Dual Chambered
2. Is the primary and secondary air preheated?
4. Is there a monitoring system for operational parameter? (temperature)
7. Does this include auxiliary burners?
1. Is the residence time more than 2 seconds?
1. Is the primary and secondary air preheated?
Incinerator
5. Is there a data logging system?
Mode of Heating: Heating Elements