Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage
Minimum running temperature level 1200 ° C, please indicate.
1000 Litre Gas Storage Tank + Pipeline System, indicate quantity.
One year Spare Elements Bundle for full maintainability.
Guarantee, show no of years
Burn Rate – – – – 150kg/hour minimum.
2nd burning.
Guarantee, indicate no of years
Warmth Waste Incinerator
Ability at least (4000) kg/day (( Day= 16 Working Humans Resources))
Ability at the very least (4000) kg/day (( Day= 24 Working Hrs))
With the following qualities:
* Automatic feeder as first part of the unit.
* Automatic ash/ leftovers removal as preliminary area of the device.
* Water Injection System to handle the temperature > >
* Flue gas filtering system abiding by EU.
Gas Retention Period 2 Seconds.
Burn Cost 100kg/h minimum.
Second Chamber.
Smokeshaft with a marginal altitude of 4 meters above ground level.
2nd Chamber.
Minimum leave rate of the emissions less than 10 metres/second.
Incinerator version C.
Diesel/LPG/LNG burning vital burning chamber/primary burning region
Chimney
Second burning
Bonus chimney expansion, suggest height.
Weight (kg), please indicate:.
Chimney with a very little height of 4 meters above ground level
Burn Rate 250kg/h minimal
Weight (kg) please showProgram.
Gas Diesel/LPG/LNG, please app.
Melt Rate 65kg/h minimal
Weight (kg), please show:
Secondary Chamber
Gas Retention Time – – – – two Secs
– Fuel – Diesel/LPG/LNG, please reveal
Power Supply for Control Box – 220V-240V 50Hz solitary phase
Minimum running temperature level 850 ° C, please urge
One year Spare Components Prepare for total maintainability
10m Tube Pipe, urge size
I000 Litre Gas Tank + Pipeline System, show quantity
Added smokeshaft expansion, show altitude
Solution warranty, suggest no of years
Thing 2
Minimum running temperature level 1200 ° C, please program
One year Spare Components Prepare for full maintainability
10m Tube Pipe, show size.
Residence time in the second room not much less than two seconds.
Control box that can be split as well as mounted on separate stand at least 1.5 meters from burner at about 1.6 meter
elevation.
Product 7.
Control box that can be split as well as mounted on different stand a minimum of 1.5 meters from burner at around 1.6 meter
heightItem 1
General.
Residence time in the second room less than 2 secs
Diesel/LPG/LNG burning primary burning chamber/primary combustion region.
Assurance, show no of years
Weight (kg) please show:.
Temperature level Cautions
HTW Mobile Heater version G.
. Minimum running temperature level 920 ° C, please urge.
Minimum leave velocity of the sparks very little less than 10 metres/second
Mobile Incinerator version F
Melt Rate 100kg/h minimal
Weight (kg), please indicate:
Second Chamber
Gas Retention Time – – – – two Secs
– Fuel – Diesel/LPG/LNG, please suggest
Power Supply for – Control Box – 220V-240V 50Hz solitary phase
Minimum running temperature level 850 ° C, please suggest
One year Spare Components Bundle for full maintainability
10m Pipeline Pipe, suggest size
1000 Litre Gas Container + Pipe System, show amount
Additional smokeshaft expansion, show altitude
Service warranty, indicate no of years.
Smokeshaft.
Both essential along with the second temperature levels maintained up until all the waste has actually been entirely stired up
Fuel Diesel/LPG/LNG, please show.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Mobile Heater version E
Melt Cost 50kg/h minimal
Weight (kg), please program:
Second Chamber
Gas Retention Time – – – – 2 Seconds –
– Gas – Diesel/LPG/LNG, please suggest
Power Supply for Control Box – 220V-240V 50Hz solitary stage
Minimum running temperature degree 850 ° C, please suggest
One year Spare Elements Package for complete maintainability.
Service warranty, indicate no of years
Warmth Waste Burner
Ability at the very least (4000) kg/day (( Day= 16 Functioning Hrs))
Ability at the very least (4000) kg/day (( Day= 24 Working Hrs))
With the complying with qualities:
* Automatic feeder as initial component of the device.
* Automatic ash/ leftovers elimination as preliminary element of this system.
* Water Injection System to control the temperature level > >
* Flue gas filtering system after by EU.
* Consistent discharge monitoring as well as recording system.
elevation.
Bonus smokeshaft expansion, suggest elevation.
Both primary and the further temperature amounts protected up until all of the waste has been totally ignited.
Secondary Chamber.
Audible and/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
I000 Litre Gas Tank + Pipe System, indicate amount.|1000 Litre Gas Storage Tank + Pipeline System, indicate quantity.
Weight (kg) please showProgram.
Second burning
Audible and/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.
Smokeshaft with a marginal altitude of 4 meters above ground level.
2nd burning.
Both essential along with the second temperature levels maintained up until all the waste has actually been entirely stired up
General
Chimney
Both primary and the further temperature amounts protected up until all of the waste has been totally ignited.
Minimum running temperature level 1200 ° C, please program
One year Spare Components Prepare for full maintainability