.Necessary tooling and gauges shall have to be provided.
14. Supplier shall have to arrange free training for consumer staff in operation and maintenance
15. Supplier shall have to supply related drawings/diagrams (civil, mechanical and electrical etc.)electrical load and
electrical circuitry
16. Warranty period shall be 24 months from date of proving test.
We’re in the process of constructing a new hospital waste treatment plant and we’re assessing different technologies
from around the world. We’re wanting to incinerate approx. 1 to 2 tons of bio-medical waste per day using LPG for
heating. Please send me all general advice and quotes for machines of all ranges which could meet our needs.
Additionally, please include emissions reports of all of the various machines that may be of interest to us particularly with
regards to dioxins and furals as well as lists of recommendations from past customers.
destruction capacity: 3.000 kcal/kg diesel.
max consume: 2.5 gal per hour.
1 camera:
1 burner capacity: 80.00 kcal
Sort: K (Ni-CrNi)
enter size: 500x500mm
ash door: 190 x 250mm
all kind of health, hospital, veterinary and industrial wastes by Incineration Process.
We ’re interested with your Incinerator plants, and we want to get quotation and key features description of
distinct capabilities of your Incinerator plants, concerning: small versions (5 — 25 kg/hr); medium versions (25-50 kg/hr)
and big versions (50-100 kg/hr) and plus.
2 camera:
1 burner capacity: 80.000 kcal.
Air conbustion: 0.5 HP
Sort: K (Ni-CrNi)
- Total waste produced per day: 10-12 tonnes;
- Hours of Operation: 10 hours a day;
- Fuel requirement: Diesel or waste oil preferred but LP gas will be considered;