The Incineration System comprises of:
I. Main Incinerator with.
an incinerator for food waste and polythene waste administration. As per our requirements we would like the YD 15C miniature incinerator.Mixed Biomedical waste Incinerator.Contract duration: To be made a decision by the supplier
5. Anticipated fuel consumption: 30-35 kgs/hr **( depending upon overall
IV. Eductor Setting up for:.
IX. Smokeshaft of 2.5 Mtr elevation.
Burners temperature level controlled (TIC– Thermocouple) and deal with ON–.
Mix of the waste, dampness
6. 7-8 KW (A/C 3 stage,220 V, 50 Hz).
WASTE BUCKET/TANK – – ABOUT 2000KG
ii. 1 No. Fully automatic Fuel Oil heater for extra chamber.
signs and.
III. Centrifugal forced draft follower setting up complete with motor drive, duct and also.
device.
MELTING AT ABOUT 150/165 -200 IN 60MINS
VI. Electric electric wiring of the device.
Burning air.
Eductor air.
/ or alarms for efficient and also secure procedure of the system.
2.
.
1.
VII. Oil storage tank of 1000 ltrs ability mounted on the slide.
VIII. Running tools and takes on comprising – rake, hoe, shovel (I No. each).
II i. 1 No. Fully automated gas Oil burner for main chamber.
Settlement terms:100% prepayment through financial institution TT after signing of agreement.
Please confirm your decision to execute this contract task by sending out pamphlet and your price quote for the under spec to enable us submit it to the company incharge of the contract for their study and also approval.
THE BURNER SHALL USAGE DIESEL/OIL
OFF basis. The regularity on ON– OFF depends upon the character of.
Maintaining the entire system under adverse pressure to stay clear of gases/ dust.
Bits rushing out of billing door.
ABILITY OF FEEDING: REGARDING 600-800Kg Each Moment.
V. Electric Control Panel together with security and securities, and also Sound/ Visual.
7. Total room demand: 9 m (L) X 8 m (W) X 6 m (H) Each unit
WITH CHIMNEY, ELECTRIC PANNELS, ELECTRIC MOTORS, and so Forth
waste. The gas usage likewise is determined by the frequency of the doorway.
Air conditioning of exhaust gases from 900– 1000 0 C to around 350 0 C.
Dampers, etc installed on the typical slide of the device to provide:.
We have actually mentioned.
4. Type of Heater procedure: Automatic
Waste, wetness web content, calorific worth, and so forth as well as will differ from waste to.
3. Kind of gas: LDO/ HSD
B. Container lift + DFDV device for autoloading and also Deashing.
Eductor air.
IV. Eductor Setting up for:.
Air conditioning of exhaust gases from 900– 1000 0 C to around 350 0 C.
Maintaining the entire system under adverse stress to stay clear of hot gases/ dust.
bits rushing out of billing door.
V. Electric Control Panel together with safety and securities, and also Sound/ Visual.
signs and.
/ or alarms for efficient and also risk-free procedure of the system.
VI. Electric electrical wiring of the device.
VII. Oil storage tank of 1000 ltrs ability mounted on the skid.
VIII. Operating tools and takes on consisting of– rake, hoe, shovel (I No. each).
IX. Smokeshaft of 2.5 Mtr elevation.