The tools will absolutely be accredited for process from PME after departure site investigations.Manual tons double chamber
burner for clinical waste to melt 50kg/hr on consistent treatment, with Key temperature level roughly
800degC minimal as well as 1200degC or even additional in the excess room, complete with invoicing door, Ash door, Air as well as check out
vents, complementary air system with adjustable dampers, burners and heater control system and also ignition device, the whole to
satisfy NEMA requirements as well as other international requirements. BURNER FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capacity design, MP 500
medical burner.
* A switch breaker for every engine (ventilators and also burners).
* A regulatory authority with watch for the temperature of post combustion.
* A timer with flexible temporization for the legislation of each heater.
15. Gas: diesel.
9. The incineration should be completely lacking visible smoke in addition to offending smells.
– Thickness: ≥ 75 mm.
* A second shot of air to ensure exceptional oxygen web content.
* Heating system with gas, mono-bloc spreading helping type with straight fire, lighting in addition to safety of digital
ignition, lasting air circulation, electro-magnetic sluice entryway of guideline and isolating valve.
From the manufacturing facility; it will consist of medicinal as well as likewise preventative maintenance, as well as using instrument, etc
CAPABILITY: Burner 150 kg/hr.
– – – – Assumption: basic medical facility beds 50%, process beds 50% to the 100 bed gym situation, while this
ratio is 30-70% to the other cases
2. It has to have the capacity to run not much less than 10 hours/day 3. This incinerator must have the capability to wreck all flammable wastes produced by medical centers, special facilities,
labs, institutes, Etc
– – Safeguard in fibrous panel.
Would certainly it be possible to give us information on the ability of burner we want
on this island.
–– – – Around 150 KG/Hrs. Heater to dispose our daily routine departure for this size of this cattle ranch.1. Can the
100kg/hr melt powerful waste/hazardous waste like run out paints, waste oil or chemicals.
25. The technical training of drivers will surely have to be offered and also provided by a specialist.
From the factory; it’ll include medicinal and also preventative maintenance, and utilizing device, etc
25. The technical training of vehicle drivers will absolutely have to be offered as well as additionally provided by an expert.
INCINERATOR, DIESEL.
Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic
plastics,
10. – Message combustion: >> 1100oC.
23. Discharge Specifications Conformity: BS 3316 or similar need.
–– – – international criteria as well as also waste manufacturings presumptions should use
* Plate of combustion in Carborundum, staying free from the dealing with of glass and slags.
18. A chamber of post burning of gases.
BURNER FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2.
instance the burner will be operating for 10 hrs daily shows the oil use will be ~ 140 Litres or also a lot more? Do you have really put up shelters?Installation of waste disposal system (biomedical) 500kg capability layout, MP 500
technological burner.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
24. The provider will perform an onsite installment of this incinerator.
16. The supplier has to supply essential information for the greatest of this installation.
The Internal size of this Smokeshaft: Ø 400 as well as its altitude: 8 m.
– Shield in primitive panels:.
7. It should have the ability to lower the quantity of wastes by 98%.
– – Refractory concrete:.
22. The carrier should provide sets of extra components of initial necessity in addition to palatable of the heater.
12. The Volume of the burning chamber: 1.200 L.
23. The installed incinerator should birth a 1 year guarantee.
13.
medical waste incinerator choices in addition to costs for 100 bed/ 500 mattress / 1000 mattress / 3000 bed health care facilities.
23. Ability to treat Plastic: Very little less than 40 percent by weight.
* Frontage of filling with door seals climbed on joints, wheel of screw plug, adaptable joint, as well as packaging shielding
from refractory.
21. Controls along with plans:.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
* Carcass in solid sheet steel with assistance of link.
6. The incinerator has to remain clear of the launching of black smoke as well as great dust, (Electric) throughout the loadings.
14. Heater procedure have to be Automatic On/Off.
* A heater of lighting that the usage is limited to the ignition of waste.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
22. Process Filtering system: Scrubber to be mentioned as optional.
– Nature: Calcium silicate. * Heater of lights of waste, with gas, typical mono-bloc dispersing directing diving flame, lights as well as safety of
electronic ignition, irreparable air circulation, electro-magnetic sluice gateway of legislation together with dividing shutoff.
22. The supplier must give batches of spare pieces of first urgency as well as consumable of this burner.
23. Ability to deal with Plastic: Not much less than 40 percent by weight.
* A regulator with digital watching for the temperature of burning.
* A regulator with digital watching for the temperature of burning.
* The insulation of the burning chamber should surely be comprised of refractory blocks, using a high material of aluminum
as well as also insulates bricks in order to make sure a minimum temperature level on the outside sheet steel.
* Electro-ventilator dispersing the second air, the plan of the air flow being executed by valves and also
after the control of the automatic cycle.
* A tool of injection of air allowing an overall re-combustion of gases,.
. Nature: 42 percent of Al203.
* A sheath of release of the gases sweltered.
Control box watertight into dust, consisting of:
* A switch breaker for each and every engine (ventilators and also heaters).
* Electric box.
21. The de- ashing has to be carried out in lowest level of the burning chamber or the deashing need to be Automatic or hands on
established de ashing.
* Faultlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Loads.
* Make-up of the refractory;.
* A device of air ducts of cooling of waste gases,.
23. The mounted incinerator should birth a 1 year warranty.
* A timer with flexible temporization for the law of every burner.
* A regulative authority with hope the temperature level of post burning.
24. The supplier will execute an onsite installation of the burner.
– – – – fragments that can be quickly prepared – – – Factors that handily deteriorate such as wood, paper, natural leather and rubbish – – – Chemical waste solids as well as also fluids, waste oil as well as additionally numerous other difficult-to-handle things
The devices will be certified for process from PME after passing website investigations.Manual lots double chamber
burner for scientific waste to melt 50kg/hr on consistent treatment, with Key temperature level roughly
800degC minimal as well as 1200degC and even additional in the Added room, full with payment door, Ash door, Air as well as check out
ports, supporting air system with adjustable dampers, burners and also heater control system and also ignition system, the whole to
satisfy NEMA needs together with numerous other global needs. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Стоимость и доставка до г.Алматы Казахстан
The technological details we respect are:
–– – – Ability ( burning capacity of waste per human resources). 150kg/hour. Burner with 300l waste chamber
–– – – Construct products, 5mm Excellent top quality light steel building; 100 mm superb quality refractory cellular lining.
–– – – High Temperature paint finish.we have two health centers, even more afterwards 20 dental expert workplaces, and also over 50 physician workplaces.
Nature: Calcium.
Nature: 65 percent of Al203.
* A reduction of burning of gases,.
This heater with “PYROLYTIC” burning need to have: 17.
22. Process Filtering system: Scrubber to be mentioned as optional.
8. It should be able to hold exhaust in the 2nd thaw with gas home of not less than 2 secs.
4. Design Demands: Kinds A, B, C, D, as well as E of specialist waste 5. ” PYROLYTIC” burning, by controlling the gasification of waste.
19. A control box making certain the complete cycle of burning.
20. Follower:.
* Electric box.
21. The de- ashing has to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands on
set de ashing.
24.
Organic rubber, artificial rubber, polyurethane sheet, and also difficult films, solids as well as also|– – – Chemical waste solids as well as additionally fluids, waste oil and also numerous other difficult-to-handle items
The tools will absolutely be accredited for process from PME after departure site investigations.Manual tons double chamber
burner for clinical waste to melt 50kg/hr on consistent treatment, with Key temperature level roughly
800degC minimal as well as 1200degC or even additional in the excess room, complete with invoicing door, Ash door, Air as well as check out